Premier Inn Croydon

Client:

Peveril Securities

Contractor:

Bowmer + Kirkland

M&E Value:

£1.7 Million

Completion Date:

July 2013

About The Project:

This project involved the construction of new Premier Inn Hotel in the heart of Croydon. Derry Building Services were involved with the development of the design along with the manufacture, supply and installation of all mechanical and electrical services to the hotel and existing car park.

The hotel is set over seven floors and comprises of 168 bedrooms, a reception area, restaurant and 380m2 of retail unit located on the ground floor for future occupation.

Photos © B+K

Mechanical Scope:

  • Domestic hot and cold water installation
  • Above ground drainage
  • Natural gas installation
  • Bathroom extract ventilation
  • Ventilation and air conditioning
  • Comms room cooling system
  • Beer store cooling system
  • Toilet extract ventilation
  • Bedroom comfort cooling and heating
  • Automatic control systems
  • Smoke ventilation
  • Dry risers
  • Sanitaryware
  • Thermal insulation
  • Syphonic rainwater installation
  • Leak detection to the retail unit
  • Above ground drainage in cast iron pipework to the retail unit
  • Testing and commissioning 

Electrical Scope:

  • Sub mains distribution
  • LV and small power
  • IT containment
  • Lighting, emergency lighting and external lighting
  • Fire detection and alarm
  • Security, intruder alarm and CCTV
  • Containment and power for the access control, door access, intercom, induction loop and CCTV
  • Disabled WC and refuge alarm system
  • Lightning protection
  • Structured cabling for TV, data, and telephone points
  • Testing and commissioning